Design meetings were held in Dar es Salaam, Tanzania, and Uzwil, Switzerland, throughout the various stages of the project. As a result of these combined efforts, the plant was engineered, delivered, installed, and commissioned in good time and to specification. Bühler's expertise and the excellent collaboration have delivered tangible results. With its new grain terminal operating at the rated capacity, the Bakhresa Group is now able to run its operations faster and more efficiently. Grain can be delivered to processing facilities in a timely manner, reliably, and with high quality.