Bühler supplied the machines along with the pre-fabricated structure and automation system, providing a comprehensive solution encompassing everything from pre-cleaning to color sorting. While a project of this scale would normally take at least six months to deliver, Bühler was able to execute the entire project in around half that time.
Installing UniLine has also meant a much smaller plant footprint, with a significant reduction in power consumption. The solution, which was finalized in November 2022, is also far easier to maintain and requires less labor than the company’s previous 8tph plant, while end-to-end processing time is far quicker. This has allowed Lathpandura to boost its productivity substantially, taking it to the next level of success.