Vyncke employs 370 like-minded change makers in nine locations. “Today we engineer, install, and start up around 40 energy plants per year all over the world. There’s nothing quite like the feeling of what we call ‘the first fire’ and we celebrate it every time with our customers to share our joy and passion for fire,” explains Vincent Weyne, Sales Director at Vyncke. “Each solution is tailor-made to a plant’s needs, and the fire burns up to 1,000 degrees Celsius to generate between one and one hundred Megawatt thermal (MWth) for hot water, steam, thermal oil, or gas, and one to twenty Megawatt electric (MWe) for power generation.”
There’s every reason to celebrate the start-up of a new energy plant according to the Vynckeneers. “Lighting this fire together is the culmination of all the hard work everyone has put into a project. It’s also the first day when a customer starts reaping the benefits of their investment. If you look at the installation at City Group’s plants in Dhaka in Bangladesh – one of our biggest common installations so far, which we completed in 2017 – the impact on energy usage and the subsequent cost reduction is staggering,” says Weyne. “We installed two highly efficient steam boilers, each generating 32 tons of process steam for the parboiling plant. When both boilers run at full capacity, they convert nearly 300 tons of rice husk per day that would otherwise be dumped or landfilled. This solves a waste problem and also allows City Group to save 250 tons of fuel oil a day, enabling them to reduce the CO₂ emissions of their parboiler plant by 60 percent.”