SPEEDiall.

Increase the profitability of your die casting systems by cutting the cycle time by as much as 10 to 15%.

Principle
System productivity can be increased by reducing the cycle time by the amount of time needed to feed the molten metal into the shot sleeve, by filling the metal into the sleeve while the die is still open. This is achieved by installing a cooled shut-off element ahead of the shot sleeve. 

 

Applicability
The requirements for adding this unit to your system are: 

- Machine with dat@speed or dat@net control system
- Sufficient clearance underneath the die for adding the shut-off elements
- A core pull valve on the fixed half
- Automatic die spraying
- Automatic molten metal feed

 

What you must retrofit 

- SPEEDiall software module
- Addition of the shut-off element on the die
- Additional hydraulic accumulator with valves

 


DIE CASTING
Die Casting
Bühler Druckguss AG
Switzerland
P: +41 71 955 12 12
F: +41 71 955 25 88


More contact info